EB Fullerton Ave over M-39
GoodWayne County, Michigan · In Detroit · Structure no. 000000000011694
- Built
- 1964
- 61 years old, rebuilt 2010
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 167 ft
- 4 main spans
- Daily traffic
- 1,500
- 2008 count
- Owner
- State
- State Highway Agency
About this bridge
EB Fullerton Ave over M-39 is a prestressed concrete stringer/multi-beam or girder carrying EB Fullerton Ave over M-39 in Wayne County, Michigan. It was built in 1964 and reconstructed in 2010, so it is 61 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,500 vehicles a day, roughly 3% of them trucks, projected to reach 1,700 by 2035. The structure is 167 ft (50.8 m) long and 55 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was EB Fullerton Ave over M-39 built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2010.
What condition is EB Fullerton Ave over M-39 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does EB Fullerton Ave over M-39 carry?
About 1,500 vehicles per day (2008 count), of which roughly 3% are trucks.
How long is EB Fullerton Ave over M-39?
The structure is 167 ft (50.8 m) long with a longest span of 53 ft (16.1 m) and a deck 55 ft wide.
Who owns EB Fullerton Ave over M-39?
It is owned by the State Highway Agency.