US Bridges

I-75 NB over Blakely Drain

Good

Wayne County, Michigan · 0.2 MI S of Taylor · Structure no. 000000000011626

Built
1964
61 years old, rebuilt 2019
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
46,853
2015 count
Owner
State
State Highway Agency

About this bridge

I-75 NB over Blakely Drain is a steel stringer/multi-beam or girder carrying I-75 NB over Blakely Drain in Wayne County, Michigan. It was built in 1964 and reconstructed in 2019, so it is 61 years old, older than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 46,853 vehicles a day, roughly 20% of them trucks, projected to reach 52,548 by 2038. The structure is 40 ft (12.2 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-75 NB
CrossesBlakely Drain
Location0.2 MI S of Taylor
RouteInterstate 75
Coordinates42.18236, -83.24322
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88.2 US tons
Inventory rating52.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length40 ft (12.2 m)
Longest span37 ft (11.4 m)
Deck width63 ft (19.3 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic46,853 (2015)
Projected traffic52,548 by 2038
Trucks20%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-75 NB over Blakely Drain built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2019.

What condition is I-75 NB over Blakely Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I-75 NB over Blakely Drain carry?

About 46,853 vehicles per day (2015 count), of which roughly 20% are trucks.

How long is I-75 NB over Blakely Drain?

The structure is 40 ft (12.2 m) long with a longest span of 37 ft (11.4 m) and a deck 63 ft wide.

Who owns I-75 NB over Blakely Drain?

It is owned by the State Highway Agency.