US Bridges

Breakfast U-Trn LN over I-96

Good

Wayne County, Michigan · In Redford Twp · Structure no. 000000000011501

Built
2014
11 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
200 ft
2 main spans
Daily traffic
3,000
1995 count
Owner
State
State Highway Agency

About this bridge

Breakfast U-Trn LN over I-96 is a prestressed concrete box beam or girders - single or spread carrying Breakfast U-Trn LN over I-96 in Wayne County, Michigan. It was built in 2014, so it is 11 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,000 vehicles a day, roughly 3% of them trucks, projected to reach 4,734 by 2034. The structure is 200 ft (61.1 m) long and 52 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBreakfast U-Trn LN
CrossesI-96
LocationIn Redford Twp
RouteCounty Highway 0
Coordinates42.38472, -83.30737
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating43.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadGreater than HL 93
Structure length200 ft (61.1 m)
Longest span99 ft (30.1 m)
Deck width52 ft (16 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,000 (1995)
Projected traffic4,734 by 2034
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Breakfast U-Trn LN over I-96 built?

It was built in 2014, making it 11 years old in 2025.

What condition is Breakfast U-Trn LN over I-96 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Breakfast U-Trn LN over I-96 carry?

About 3,000 vehicles per day (1995 count), of which roughly 3% are trucks.

How long is Breakfast U-Trn LN over I-96?

The structure is 200 ft (61.1 m) long with a longest span of 99 ft (30.1 m) and a deck 52 ft wide.

Who owns Breakfast U-Trn LN over I-96?

It is owned by the State Highway Agency.