US Bridges

Moross RD NB over I-94

Good

Wayne County, Michigan · In Detroit · Structure no. 000000000011261

Built
2003
22 years old
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
163 ft
2 main spans
Daily traffic
20,000
2003 count
Owner
State
State Highway Agency

About this bridge

Moross RD NB over I-94 is a prestressed concrete box beam or girders - multiple carrying Moross RD NB over I-94 in Wayne County, Michigan. It was built in 2003, so it is 22 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,000 vehicles a day, roughly 3% of them trucks, projected to reach 23,000 by 2023. The structure is 163 ft (49.8 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMoross RD NB
CrossesI-94
LocationIn Detroit
RouteCounty Highway 2057
Coordinates42.42476, -82.92844
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86.1 US tons
Inventory rating51.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length163 ft (49.8 m)
Longest span82 ft (24.9 m)
Deck width70 ft (21.2 m)
Roadway width59 ft (18 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,000 (2003)
Projected traffic23,000 by 2023
Trucks3%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Moross RD NB over I-94 built?

It was built in 2003, making it 22 years old in 2025.

What condition is Moross RD NB over I-94 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Moross RD NB over I-94 carry?

About 20,000 vehicles per day (2003 count), of which roughly 3% are trucks.

How long is Moross RD NB over I-94?

The structure is 163 ft (49.8 m) long with a longest span of 82 ft (24.9 m) and a deck 70 ft wide.

Who owns Moross RD NB over I-94?

It is owned by the State Highway Agency.