US Bridges

Brush ST over I-94

Good

Wayne County, Michigan · In Detroit · Structure no. 000000000011212

Built
2019
6 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
228 ft
2 main spans
Daily traffic
10,615
2017 count
Owner
State
State Highway Agency

About this bridge

Brush ST over I-94 is a prestressed concrete stringer/multi-beam or girder carrying Brush ST over I-94 in Wayne County, Michigan. It was built in 2019, so it is 6 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,615 vehicles a day, roughly 4% of them trucks, projected to reach 10,975 by 2037. The structure is 228 ft (69.6 m) long and 61 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBrush ST
CrossesI-94
LocationIn Detroit
RouteCity Street 2000
Coordinates42.36564, -83.06446
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating103.6 US tons
Inventory rating52.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadGreater than HL 93
Structure length228 ft (69.6 m)
Longest span121 ft (36.8 m)
Deck width61 ft (18.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,615 (2017)
Projected traffic10,975 by 2037
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Brush ST over I-94 built?

It was built in 2019, making it 6 years old in 2025.

What condition is Brush ST over I-94 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Brush ST over I-94 carry?

About 10,615 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Brush ST over I-94?

The structure is 228 ft (69.6 m) long with a longest span of 121 ft (36.8 m) and a deck 61 ft wide.

Who owns Brush ST over I-94?

It is owned by the State Highway Agency.