Good

Washtenaw County, Michigan · Scio Township Section 14 · Structure no. 000000000010981

Built
2021
4 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
26 ft
1 main span
Daily traffic
4,600
2020 count
Owner
County
County Highway Agency

About this bridge

Miller Road over Honey Creek is a concrete culvert carrying Miller Road over Honey Creek in Washtenaw County, Michigan. It was built in 2021, so it is 4 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,600 vehicles a day, roughly 8% of them trucks, projected to reach 5,600 by 2040. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesMiller Road
CrossesHoney Creek
LocationScio Township Section 14
RouteCounty Highway 2006
Coordinates42.30953, -83.80772
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating74 US tons
Inventory rating56.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length26 ft (7.9 m)
Longest span26 ft (7.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,600 (2020)
Projected traffic5,600 by 2040
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$220,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Miller Road over Honey Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is Miller Road over Honey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Miller Road over Honey Creek carry?

About 4,600 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is Miller Road over Honey Creek?

The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m).

Who owns Miller Road over Honey Creek?

It is owned by the County Highway Agency.