US-23 SB over Mdot RR Corridor

Good

Washtenaw County, Michigan · 0.5 MI S of Livingston CO · Structure no. 000000000010877

Built
2017
8 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
108 ft
1 main span
Daily traffic
33,375
2017 count
Owner
State
State Highway Agency

About this bridge

US-23 SB over Mdot RR Corridor is a steel stringer/multi-beam or girder carrying US-23 SB over Mdot RR Corridor in Washtenaw County, Michigan. It was built in 2017, so it is 8 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 33,375 vehicles a day, roughly 8% of them trucks, projected to reach 35,775 by 2037. The structure is 108 ft (32.9 m) long and 72 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS-23 SB
CrossesMdot RR Corridor
Location0.5 MI S of Livingston CO
RouteU.S. Route 23
Coordinates42.4252, -83.76852
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating83.9 US tons
Inventory rating64.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadGreater than HL 93
Structure length108 ft (32.9 m)
Longest span103 ft (31.3 m)
Deck width72 ft (22 m)
Roadway width69 ft (21 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33,375 (2017)
Projected traffic35,775 by 2037
Trucks8%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-23 SB over Mdot RR Corridor built?

It was built in 2017, making it 8 years old in 2025.

What condition is US-23 SB over Mdot RR Corridor in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does US-23 SB over Mdot RR Corridor carry?

About 33,375 vehicles per day (2017 count), of which roughly 8% are trucks.

How long is US-23 SB over Mdot RR Corridor?

The structure is 108 ft (32.9 m) long with a longest span of 103 ft (31.3 m) and a deck 72 ft wide.

Who owns US-23 SB over Mdot RR Corridor?

It is owned by the State Highway Agency.