US Bridges

Birch Run Road over Thetford-Arbela I/C Drn

Good

Tuscola County, Michigan · Sec 23-26 Arbela Twp · Structure no. 000000000010450

Built
1978
47 years old
Condition
Good
inspected June 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
34 ft
1 main span
Daily traffic
3,540
2009 count
Owner
County
County Highway Agency

About this bridge

Birch Run Road over Thetford-Arbela I/C Drn is a prestressed concrete box beam or girders - multiple carrying Birch Run Road over Thetford-Arbela I/C Drn in Tuscola County, Michigan. It was built in 1978, so it is 47 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,540 vehicles a day, projected to reach 6,390 by 2029. The structure is 34 ft (10.4 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBirch Run Road
CrossesThetford-Arbela I/C Drn
LocationSec 23-26 Arbela Twp
RouteCounty Highway 7908
Coordinates43.25167, -83.61331
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating61.1 US tons
Inventory rating36.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length34 ft (10.4 m)
Longest span32 ft (9.9 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,540 (2009)
Projected traffic6,390 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Birch Run Road over Thetford-Arbela I/C Drn built?

It was built in 1978, making it 47 years old in 2025.

What condition is Birch Run Road over Thetford-Arbela I/C Drn in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Birch Run Road over Thetford-Arbela I/C Drn carry?

About 3,540 vehicles per day (2009 count).

How long is Birch Run Road over Thetford-Arbela I/C Drn?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.9 m) and a deck 43 ft wide.

Who owns Birch Run Road over Thetford-Arbela I/C Drn?

It is owned by the County Highway Agency.