Lansing Road over Holly Drain
FairPosted for loadShiawassee County, Michigan · 0.5 MI NE of Durand · Structure no. 000000000009785
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 53 ft
- 1 main span
- Daily traffic
- 6,858
- 2011 count
- Owner
- County
- County Highway Agency
About this bridge
Lansing Road over Holly Drain is a prestressed concrete box beam or girders - multiple carrying Lansing Road over Holly Drain in Shiawassee County, Michigan. It was built in 1988, so it is 37 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 6,858 vehicles a day, roughly 20% of them trucks, projected to reach 10,190 by 2031. The structure is 53 ft (16.1 m) long and 43 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lansing Road over Holly Drain built?
It was built in 1988, making it 37 years old in 2025.
What condition is Lansing Road over Holly Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Lansing Road over Holly Drain carry?
About 6,858 vehicles per day (2011 count), of which roughly 20% are trucks.
How long is Lansing Road over Holly Drain?
The structure is 53 ft (16.1 m) long with a longest span of 48 ft (14.6 m) and a deck 43 ft wide.
Who owns Lansing Road over Holly Drain?
It is owned by the County Highway Agency.