Peck Road over Elk Creek Drain
GoodSanilac County, Michigan · Sec 30-31 Elk Twp · Structure no. 000000000009522
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected July 2023
- Type
- Culvert
- Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 1,538
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Peck Road over Elk Creek Drain is a concrete culvert carrying Peck Road over Elk Creek Drain in Sanilac County, Michigan. It was built in 2023, so it is 2 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,538 vehicles a day, roughly 10% of them trucks, projected to reach 2,778 by 2030. The structure is 34 ft (10.3 m) long. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Peck Road over Elk Creek Drain built?
It was built in 2023, making it 2 years old in 2025.
What condition is Peck Road over Elk Creek Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Peck Road over Elk Creek Drain carry?
About 1,538 vehicles per day (2010 count), of which roughly 10% are trucks.
How long is Peck Road over Elk Creek Drain?
The structure is 34 ft (10.3 m) long with a longest span of 34 ft (10.3 m).
Who owns Peck Road over Elk Creek Drain?
It is owned by the County Highway Agency.