US Bridges

I-94 & I-69 over M-25 Pine Grove Ave

Good

St. Clair County, Michigan · Port Huron @ Plaza · Structure no. 000000000012763

Built
1993
32 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
121 ft
1 main span
Daily traffic
43,238
2007 count
Owner
State
State Highway Agency

About this bridge

I-94 & I-69 over M-25 Pine Grove Ave is a prestressed concrete stringer/multi-beam or girder carrying I-94 & I-69 over M-25 Pine Grove Ave in St. Clair County, Michigan. It was built in 1993, so it is 32 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 43,238 vehicles a day, roughly 31% of them trucks, projected to reach 16,670 by 2018. The structure is 121 ft (37 m) long and 433 ft wide.

CarriesI-94 & I-69
CrossesM-25 Pine Grove Ave
LocationPort Huron @ Plaza
RouteInterstate 94
Coordinates42.99816, -82.4365
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88.6 US tons
Inventory rating43.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length121 ft (37 m)
Longest span116 ft (35.3 m)
Deck width433 ft (132 m)
Roadway width429 ft (130.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic43,238 (2007)
Projected traffic16,670 by 2018
Trucks31%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-94 & I-69 over M-25 Pine Grove Ave built?

It was built in 1993, making it 32 years old in 2025.

What condition is I-94 & I-69 over M-25 Pine Grove Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does I-94 & I-69 over M-25 Pine Grove Ave carry?

About 43,238 vehicles per day (2007 count), of which roughly 31% are trucks.

How long is I-94 & I-69 over M-25 Pine Grove Ave?

The structure is 121 ft (37 m) long with a longest span of 116 ft (35.3 m) and a deck 433 ft wide.

Who owns I-94 & I-69 over M-25 Pine Grove Ave?

It is owned by the State Highway Agency.