US Bridges

Burt Road over Pine Run Creek

Good

Saginaw County, Michigan · 0.4 MI E of Marshall Road · Structure no. 000000000009415

Built
2023
2 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
54 ft
1 main span
Daily traffic
939
2023 count
Owner
County
County Highway Agency

About this bridge

Burt Road over Pine Run Creek is a prestressed concrete box beam or girders - single or spread carrying Burt Road over Pine Run Creek in Saginaw County, Michigan. It was built in 2023, so it is 2 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 939 vehicles a day, roughly 5% of them trucks, projected to reach 1,157 by 2043. The structure is 54 ft (16.5 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBurt Road
CrossesPine Run Creek
Location0.4 MI E of Marshall Road
RouteCounty Highway 0
Coordinates43.23577, -83.84737
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.5 US tons
Inventory rating57.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadGreater than HL 93
Structure length54 ft (16.5 m)
Longest span53 ft (16.1 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic939 (2023)
Projected traffic1,157 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Burt Road over Pine Run Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Burt Road over Pine Run Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Burt Road over Pine Run Creek carry?

About 939 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Burt Road over Pine Run Creek?

The structure is 54 ft (16.5 m) long with a longest span of 53 ft (16.1 m) and a deck 31 ft wide.

Who owns Burt Road over Pine Run Creek?

It is owned by the County Highway Agency.