Volkmer Road over Misteguay Creek
FairSaginaw County, Michigan · 0.2 MI E of East Road · Structure no. 000000000009365
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 170 ft
- 2 main spans
- Daily traffic
- 207
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Volkmer Road over Misteguay Creek is a prestressed concrete box beam or girders - multiple carrying Volkmer Road over Misteguay Creek in Saginaw County, Michigan. It was built in 1992, so it is 33 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 207 vehicles a day, roughly 5% of them trucks, projected to reach 217 by 2020. The structure is 170 ft (51.8 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Volkmer Road over Misteguay Creek built?
It was built in 1992, making it 33 years old in 2025.
What condition is Volkmer Road over Misteguay Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Volkmer Road over Misteguay Creek carry?
About 207 vehicles per day (2010 count), of which roughly 5% are trucks.
How long is Volkmer Road over Misteguay Creek?
The structure is 170 ft (51.8 m) long with a longest span of 83 ft (25.3 m) and a deck 31 ft wide.
Who owns Volkmer Road over Misteguay Creek?
It is owned by the County Highway Agency.