Beyer Road over Half Moon Drain
GoodSaginaw County, Michigan · 0.1 MI N of Canada Road · Structure no. 000000000009283
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 100
- 2001 count
- Owner
- County
- County Highway Agency
About this bridge
Beyer Road over Half Moon Drain is a prestressed concrete box beam or girders - multiple carrying Beyer Road over Half Moon Drain in Saginaw County, Michigan. It was built in 2002, so it is 23 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 165 by 2021. The structure is 40 ft (12.2 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Beyer Road over Half Moon Drain built?
It was built in 2002, making it 23 years old in 2025.
What condition is Beyer Road over Half Moon Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Beyer Road over Half Moon Drain carry?
About 100 vehicles per day (2001 count), of which roughly 2% are trucks.
How long is Beyer Road over Half Moon Drain?
The structure is 40 ft (12.2 m) long with a longest span of 40 ft (12.2 m) and a deck 28 ft wide.
Who owns Beyer Road over Half Moon Drain?
It is owned by the County Highway Agency.