US Bridges

Gary Road over Fairchild Drain

Good

Saginaw County, Michigan · 0.4 MI E of Gasper Road · Structure no. 000000000009201

Built
1993
32 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
34 ft
1 main span
Daily traffic
1,272
2014 count
Owner
County
County Highway Agency

About this bridge

Gary Road over Fairchild Drain is a concrete culvert carrying Gary Road over Fairchild Drain in Saginaw County, Michigan. It was built in 1993, so it is 32 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,272 vehicles a day, roughly 5% of them trucks, projected to reach 1,336 by 2024. The structure is 34 ft (10.3 m) long. If it were closed, the detour would be 6.8 mi (11 km).

CarriesGary Road
CrossesFairchild Drain
Location0.4 MI E of Gasper Road
RouteCounty Highway 0
Coordinates43.21967, -84.04335
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.3 US tons
Inventory rating33.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length34 ft (10.3 m)
Longest span34 ft (10.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,272 (2014)
Projected traffic1,336 by 2024
Trucks5%
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Gary Road over Fairchild Drain built?

It was built in 1993, making it 32 years old in 2025.

What condition is Gary Road over Fairchild Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Gary Road over Fairchild Drain carry?

About 1,272 vehicles per day (2014 count), of which roughly 5% are trucks.

How long is Gary Road over Fairchild Drain?

The structure is 34 ft (10.3 m) long with a longest span of 34 ft (10.3 m).

Who owns Gary Road over Fairchild Drain?

It is owned by the County Highway Agency.