Joslyn Road over Grand Trunk Western RR
FairOakland County, Michigan · 2 MI S Int Joslyn & I-75 · Structure no. 000000000008266
- Built
- 1932
- 93 years old, rebuilt 1972
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 97 ft
- 3 main spans
- Daily traffic
- 13,938
- 2012 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Joslyn Road over Grand Trunk Western RR is a steel continuous stringer/multi-beam or girder carrying Joslyn Road over Grand Trunk Western RR in Oakland County, Michigan. It was built in 1932 and reconstructed in 1972, so it is 93 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,938 vehicles a day, roughly 4% of them trucks, projected to reach 17,007 by 2032. The structure is 97 ft (29.7 m) long and 62 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Joslyn Road over Grand Trunk Western RR built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1972.
What condition is Joslyn Road over Grand Trunk Western RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Joslyn Road over Grand Trunk Western RR carry?
About 13,938 vehicles per day (2012 count), of which roughly 4% are trucks.
How long is Joslyn Road over Grand Trunk Western RR?
The structure is 97 ft (29.7 m) long with a longest span of 32 ft (9.8 m) and a deck 62 ft wide.
Who owns Joslyn Road over Grand Trunk Western RR?
It is owned by the City or Municipal Highway Agency.