US Bridges

Twelve Mile over Novi-Lyon Drain

PoorPosted for load

Oakland County, Michigan · East of Martindale · Structure no. 000000000008200

Built
1961
64 years old
Condition
Poor
inspected December 2024
Type
Culvert
Steel
Length
25 ft
2 main spans
Daily traffic
300
2015 count
Owner
County
County Highway Agency

About this bridge

Twelve Mile over Novi-Lyon Drain is a steel culvert carrying Twelve Mile over Novi-Lyon Drain in Oakland County, Michigan. It was built in 1961, so it is 64 years old, older than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 300 vehicles a day, roughly 5% of them trucks, projected to reach 550 by 2025. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTwelve Mile
CrossesNovi-Lyon Drain
LocationEast of Martindale
RouteCounty Highway 0
Coordinates42.48672, -83.63197
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Last inspectionDecember 2024
Inspection intervalevery 6 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating14.7 US tons
Inventory rating8.9 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans2
Design loadHS 20 + Mod
Structure length25 ft (7.6 m)
Longest span11 ft (3.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2015)
Projected traffic550 by 2025
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Twelve Mile over Novi-Lyon Drain built?

It was built in 1961, making it 64 years old in 2025.

What condition is Twelve Mile over Novi-Lyon Drain in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.

How much traffic does Twelve Mile over Novi-Lyon Drain carry?

About 300 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Twelve Mile over Novi-Lyon Drain?

The structure is 25 ft (7.6 m) long with a longest span of 11 ft (3.3 m).

Who owns Twelve Mile over Novi-Lyon Drain?

It is owned by the County Highway Agency.