Featherstone RD EB over I-75
FairOakland County, Michigan · 0.4 MI N.Of M-59 · Structure no. 000000000008001
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 440 ft
- 4 main spans
- Daily traffic
- 12,250
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Featherstone RD EB over I-75 is a prestressed concrete stringer/multi-beam or girder carrying Featherstone RD EB over I-75 in Oakland County, Michigan. It was built in 1990, so it is 35 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,250 vehicles a day, roughly 14% of them trucks, projected to reach 13,000 by 2039. The structure is 440 ft (134.1 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Featherstone RD EB over I-75 built?
It was built in 1990, making it 35 years old in 2025.
What condition is Featherstone RD EB over I-75 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Featherstone RD EB over I-75 carry?
About 12,250 vehicles per day (2019 count), of which roughly 14% are trucks.
How long is Featherstone RD EB over I-75?
The structure is 440 ft (134.1 m) long with a longest span of 110 ft (33.5 m) and a deck 44 ft wide.
Who owns Featherstone RD EB over I-75?
It is owned by the State Highway Agency.