Northland DR WB over M-10
FairOakland County, Michigan · In Southfield · Structure no. 000000000007889
- Built
- 1965
- 60 years old, rebuilt 2000
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 162 ft
- 3 main spans
- Daily traffic
- 67,700
- 1987 count
- Owner
- State
- State Highway Agency
About this bridge
Northland DR WB over M-10 is a steel stringer/multi-beam or girder carrying Northland DR WB over M-10 in Oakland County, Michigan. It was built in 1965 and reconstructed in 2000, so it is 60 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 67,700 vehicles a day, roughly 5% of them trucks, projected to reach 77,855 by 2007. The structure is 162 ft (49.5 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Northland DR WB over M-10 built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2000.
What condition is Northland DR WB over M-10 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Northland DR WB over M-10 carry?
About 67,700 vehicles per day (1987 count), of which roughly 5% are trucks.
How long is Northland DR WB over M-10?
The structure is 162 ft (49.5 m) long with a longest span of 68 ft (20.6 m) and a deck 59 ft wide.
Who owns Northland DR WB over M-10?
It is owned by the State Highway Agency.