US Bridges

M-59 EB over East Boulevard

Fair

Oakland County, Michigan · In Pontiac · Structure no. 000000000007842

Built
1967
58 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
144 ft
3 main spans
Daily traffic
17,835
2007 count
Owner
State
State Highway Agency

About this bridge

M-59 EB over East Boulevard is a steel stringer/multi-beam or girder carrying M-59 EB over East Boulevard in Oakland County, Michigan. It was built in 1967, so it is 58 years old, older than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,835 vehicles a day, roughly 6% of them trucks, projected to reach 20,786 by 2018. The structure is 144 ft (43.9 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesM-59 EB
CrossesEast Boulevard
LocationIn Pontiac
RouteState Highway 59
Coordinates42.64428, -83.26934
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 18 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating101.7 US tons
Inventory rating61.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length144 ft (43.9 m)
Longest span84 ft (25.5 m)
Deck width48 ft (14.6 m)
Roadway width46 ft (13.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,835 (2007)
Projected traffic20,786 by 2018
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$429,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was M-59 EB over East Boulevard built?

It was built in 1967, making it 58 years old in 2025.

What condition is M-59 EB over East Boulevard in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does M-59 EB over East Boulevard carry?

About 17,835 vehicles per day (2007 count), of which roughly 6% are trucks.

How long is M-59 EB over East Boulevard?

The structure is 144 ft (43.9 m) long with a longest span of 84 ft (25.5 m) and a deck 48 ft wide.

Who owns M-59 EB over East Boulevard?

It is owned by the State Highway Agency.