US Bridges

Peach Ave over Danials Drain

Good

Newaygo County, Michigan · 6.3 MI SE Grant · Structure no. 000000000007768

Built
1979
46 years old
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
150
2000 count
Owner
County
County Highway Agency

About this bridge

Peach Ave over Danials Drain is a prestressed concrete box beam or girders - multiple carrying Peach Ave over Danials Drain in Newaygo County, Michigan. It was built in 1979, so it is 46 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, projected to reach 120 by 2020. The structure is 44 ft (13.4 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPeach Ave
CrossesDanials Drain
Location6.3 MI SE Grant
RouteCounty Highway 0
Coordinates43.33351, -85.69231
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating62.8 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length44 ft (13.4 m)
Longest span40 ft (12.2 m)
Deck width31 ft (9.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2000)
Projected traffic120 by 2020
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peach Ave over Danials Drain built?

It was built in 1979, making it 46 years old in 2025.

What condition is Peach Ave over Danials Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Peach Ave over Danials Drain carry?

About 150 vehicles per day (2000 count).

How long is Peach Ave over Danials Drain?

The structure is 44 ft (13.4 m) long with a longest span of 40 ft (12.2 m) and a deck 31 ft wide.

Who owns Peach Ave over Danials Drain?

It is owned by the County Highway Agency.