14 MI RD FH30 over Ls Br Pere Marquette Riv
GoodNewaygo County, Michigan · 5.5 East of Bitely · Structure no. 000000000007737
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected June 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 1,150
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
14 MI RD FH30 over Ls Br Pere Marquette Riv is a prestressed concrete box beam or girders - single or spread carrying 14 MI RD FH30 over Ls Br Pere Marquette Riv in Newaygo County, Michigan. It was built in 2021, so it is 4 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,150 vehicles a day, roughly 3% of them trucks, projected to reach 1,500 by 2040. The structure is 50 ft (15.2 m) long and 39 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 14 MI RD FH30 over Ls Br Pere Marquette Riv built?
It was built in 2021, making it 4 years old in 2025.
What condition is 14 MI RD FH30 over Ls Br Pere Marquette Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does 14 MI RD FH30 over Ls Br Pere Marquette Riv carry?
About 1,150 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is 14 MI RD FH30 over Ls Br Pere Marquette Riv?
The structure is 50 ft (15.2 m) long with a longest span of 49 ft (14.8 m) and a deck 39 ft wide.
Who owns 14 MI RD FH30 over Ls Br Pere Marquette Riv?
It is owned by the County Highway Agency.