US Bridges

Masters Road over Tamarack Creek

Good

Montcalm County, Michigan · 0.75 MI S of M-46 · Structure no. 000000000007529

Built
2023
2 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
187
2022 count
Owner
County
County Highway Agency

About this bridge

Masters Road over Tamarack Creek is a prestressed concrete box beam or girders - single or spread carrying Masters Road over Tamarack Creek in Montcalm County, Michigan. It was built in 2023, so it is 2 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 187 vehicles a day, roughly 2% of them trucks, projected to reach 250 by 2042. The structure is 50 ft (15.2 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesMasters Road
CrossesTamarack Creek
Location0.75 MI S of M-46
RouteCounty Highway 0
Coordinates43.42131, -85.36238
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.2 US tons
Inventory rating66.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadGreater than HL 93
Structure length50 ft (15.2 m)
Longest span48 ft (14.6 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic187 (2022)
Projected traffic250 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Masters Road over Tamarack Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Masters Road over Tamarack Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Masters Road over Tamarack Creek carry?

About 187 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is Masters Road over Tamarack Creek?

The structure is 50 ft (15.2 m) long with a longest span of 48 ft (14.6 m) and a deck 31 ft wide.

Who owns Masters Road over Tamarack Creek?

It is owned by the County Highway Agency.