US Bridges

M-55|E Houghton LA over Muskegon River

Fair

Missaukee County, Michigan · 1.8 MI W of Roscommon Col · Structure no. 000000000007030

Built
1935
90 years old, rebuilt 1989
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
90 ft
2 main spans
Daily traffic
4,338
2007 count
Owner
State
State Highway Agency

About this bridge

M-55|E Houghton LA over Muskegon River is a steel stringer/multi-beam or girder carrying M-55|E Houghton LA over Muskegon River in Missaukee County, Michigan. It was built in 1935 and reconstructed in 1989, so it is 90 years old, older than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,338 vehicles a day, roughly 15% of them trucks, projected to reach 5,507 by 2018. The structure is 90 ft (27.4 m) long and 41 ft wide. If it were closed, the detour would be 39.8 mi (64 km).

CarriesM-55|E Houghton LA
CrossesMuskegon River
Location1.8 MI W of Roscommon Col
RouteState Highway 55
Coordinates44.33503, -84.8895
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating107.1 US tons
Inventory rating81.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadH 15
Structure length90 ft (27.4 m)
Longest span44 ft (13.3 m)
Deck width41 ft (12.4 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,338 (2007)
Projected traffic5,507 by 2018
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed39.8 mi (64 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was M-55|E Houghton LA over Muskegon River built?

It was built in 1935, making it 90 years old in 2025. It was reconstructed in 1989.

What condition is M-55|E Houghton LA over Muskegon River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does M-55|E Houghton LA over Muskegon River carry?

About 4,338 vehicles per day (2007 count), of which roughly 15% are trucks.

How long is M-55|E Houghton LA over Muskegon River?

The structure is 90 ft (27.4 m) long with a longest span of 44 ft (13.3 m) and a deck 41 ft wide.

Who owns M-55|E Houghton LA over Muskegon River?

It is owned by the State Highway Agency.