US Bridges

Poseyville Road over Jo Drain

Good

Midland County, Michigan · Ingersoll Twp Sec 8/9 · Structure no. 000000000014047

Built
2017
8 years old
Condition
Good
inspected November 2023
Type
Slab
Concrete
Length
24 ft
1 main span
Daily traffic
2,196
2016 count
Owner
County
County Highway Agency

About this bridge

Poseyville Road over Jo Drain is a concrete slab carrying Poseyville Road over Jo Drain in Midland County, Michigan. It was built in 2017, so it is 8 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,196 vehicles a day, projected to reach 2,957 by 2037. The structure is 24 ft (7.3 m) long and 36 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesPoseyville Road
CrossesJo Drain
LocationIngersoll Twp Sec 8/9
RouteCounty Highway 5677
Coordinates43.5467, -84.2488
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.2 US tons
Inventory rating60 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadGreater than HL 93
Structure length24 ft (7.3 m)
Longest span20 ft (6.1 m)
Deck width36 ft (11 m)
Roadway width34 ft (10.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,196 (2016)
Projected traffic2,957 by 2037
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Poseyville Road over Jo Drain built?

It was built in 2017, making it 8 years old in 2025.

What condition is Poseyville Road over Jo Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Poseyville Road over Jo Drain carry?

About 2,196 vehicles per day (2016 count).

How long is Poseyville Road over Jo Drain?

The structure is 24 ft (7.3 m) long with a longest span of 20 ft (6.1 m) and a deck 36 ft wide.

Who owns Poseyville Road over Jo Drain?

It is owned by the County Highway Agency.