W Sugnet Road over Sturgeon Creek
PoorPosted for loadMidland County, Michigan · In City of Midland · Structure no. 000000000007011
- Built
- 1968
- 57 years old
- Condition
- Poor
- inspected July 2024
- Type
- Culvert
- Steel
- Length
- 32 ft
- 2 main spans
- Daily traffic
- 5,300
- 1990 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W Sugnet Road over Sturgeon Creek is a steel culvert carrying W Sugnet Road over Sturgeon Creek in Midland County, Michigan. It was built in 1968, so it is 57 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 5,300 vehicles a day, projected to reach 7,000 by 2010. The structure is 32 ft (9.8 m) long.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Sugnet Road over Sturgeon Creek built?
It was built in 1968, making it 57 years old in 2025.
What condition is W Sugnet Road over Sturgeon Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.
How much traffic does W Sugnet Road over Sturgeon Creek carry?
About 5,300 vehicles per day (1990 count).
How long is W Sugnet Road over Sturgeon Creek?
The structure is 32 ft (9.8 m) long with a longest span of 32 ft (9.8 m).
Who owns W Sugnet Road over Sturgeon Creek?
It is owned by the City or Municipal Highway Agency.