Tittabawassee Road over Weeks Drain
PoorMidland County, Michigan · 0.25 MI W of Schreiber RD · Structure no. 000000000006972
- Built
- 1980
- 45 years old
- Condition
- Poor
- inspected August 2024
- Type
- Culvert
- Steel
- Length
- 28 ft
- 1 main span
- Daily traffic
- 1,896
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Tittabawassee Road over Weeks Drain is a steel culvert carrying Tittabawassee Road over Weeks Drain in Midland County, Michigan. It was built in 1980, so it is 45 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,896 vehicles a day, roughly 5% of them trucks, projected to reach 2,817 by 2038. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tittabawassee Road over Weeks Drain built?
It was built in 1980, making it 45 years old in 2025.
What condition is Tittabawassee Road over Weeks Drain in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.
How much traffic does Tittabawassee Road over Weeks Drain carry?
About 1,896 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is Tittabawassee Road over Weeks Drain?
The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m).
Who owns Tittabawassee Road over Weeks Drain?
It is owned by the County Highway Agency.