Main Street over Crapeau Creek
FairMacomb County, Michigan · East of M-29 · Structure no. 000000000006416
- Built
- 1925
- 100 years old, rebuilt 1997
- Condition
- Fair
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 1,310
- 2005 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Main Street over Crapeau Creek is a prestressed concrete box beam or girders - multiple carrying Main Street over Crapeau Creek in Macomb County, Michigan. It was built in 1925 and reconstructed in 1997, so it is 100 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,310 vehicles a day, roughly 5% of them trucks, projected to reach 2,000 by 2025. The structure is 40 ft (12.1 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main Street over Crapeau Creek built?
It was built in 1925, making it 100 years old in 2025. It was reconstructed in 1997.
What condition is Main Street over Crapeau Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Main Street over Crapeau Creek carry?
About 1,310 vehicles per day (2005 count), of which roughly 5% are trucks.
How long is Main Street over Crapeau Creek?
The structure is 40 ft (12.1 m) long with a longest span of 36 ft (10.9 m) and a deck 38 ft wide.
Who owns Main Street over Crapeau Creek?
It is owned by the City or Municipal Highway Agency.