US Bridges

M-19 over Salt River

Fair

Macomb County, Michigan · 5.2 MI SW of ST Clair Col · Structure no. 000000000006135

Built
1991
34 years old
Condition
Fair
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
45 ft
1 main span
Daily traffic
13,180
2007 count
Owner
State
State Highway Agency

About this bridge

M-19 over Salt River is a prestressed concrete box beam or girders - multiple carrying M-19 over Salt River in Macomb County, Michigan. It was built in 1991, so it is 34 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,180 vehicles a day, roughly 4% of them trucks, projected to reach 12,639 by 2018. The structure is 45 ft (13.7 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesM-19
CrossesSalt River
Location5.2 MI SW of ST Clair Col
RouteState Highway 19
Coordinates42.73043, -82.78813
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating77.8 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length45 ft (13.7 m)
Longest span44 ft (13.3 m)
Deck width51 ft (15.6 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,180 (2007)
Projected traffic12,639 by 2018
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was M-19 over Salt River built?

It was built in 1991, making it 34 years old in 2025.

What condition is M-19 over Salt River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does M-19 over Salt River carry?

About 13,180 vehicles per day (2007 count), of which roughly 4% are trucks.

How long is M-19 over Salt River?

The structure is 45 ft (13.7 m) long with a longest span of 44 ft (13.3 m) and a deck 51 ft wide.

Who owns M-19 over Salt River?

It is owned by the State Highway Agency.