US Bridges

Peavy Road over Marion-Genoa Drain

Good

Livingston County, Michigan · Sec 2 Marion Twp · Structure no. 000000000005886

Built
2023
2 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
43 ft
1 main span
Daily traffic
1,595
2022 count
Owner
County
County Highway Agency

About this bridge

Peavy Road over Marion-Genoa Drain is a prestressed concrete box beam or girders - single or spread carrying Peavy Road over Marion-Genoa Drain in Livingston County, Michigan. It was built in 2023, so it is 2 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,595 vehicles a day, roughly 2% of them trucks, projected to reach 3,000 by 2042. The structure is 43 ft (13 m) long and 36 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPeavy Road
CrossesMarion-Genoa Drain
LocationSec 2 Marion Twp
RouteCounty Highway 0
Coordinates42.59308, -83.94304
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.6 US tons
Inventory rating57.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadGreater than HL 93
Structure length43 ft (13 m)
Longest span40 ft (12.1 m)
Deck width36 ft (11.1 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,595 (2022)
Projected traffic3,000 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peavy Road over Marion-Genoa Drain built?

It was built in 2023, making it 2 years old in 2025.

What condition is Peavy Road over Marion-Genoa Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Peavy Road over Marion-Genoa Drain carry?

About 1,595 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is Peavy Road over Marion-Genoa Drain?

The structure is 43 ft (13 m) long with a longest span of 40 ft (12.1 m) and a deck 36 ft wide.

Who owns Peavy Road over Marion-Genoa Drain?

It is owned by the County Highway Agency.