Norton Road over Shiawassee River Drain
FairPosted for loadLivingston County, Michigan · Marion Twp Sec 5 · Structure no. 000000000005834
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 2,390
- 2012 count
- Owner
- County
- County Highway Agency
About this bridge
Norton Road over Shiawassee River Drain is a prestressed concrete box beam or girders - multiple carrying Norton Road over Shiawassee River Drain in Livingston County, Michigan. It was built in 1959, so it is 66 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,390 vehicles a day, projected to reach 2,600 by 2042. The structure is 45 ft (13.7 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Norton Road over Shiawassee River Drain built?
It was built in 1959, making it 66 years old in 2025.
What condition is Norton Road over Shiawassee River Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Norton Road over Shiawassee River Drain carry?
About 2,390 vehicles per day (2012 count).
How long is Norton Road over Shiawassee River Drain?
The structure is 45 ft (13.7 m) long with a longest span of 44 ft (13.4 m) and a deck 35 ft wide.
Who owns Norton Road over Shiawassee River Drain?
It is owned by the County Highway Agency.