US Bridges

Rushton Road over Walker Drain

Good

Livingston County, Michigan · Sec 26 Green Oak Twp · Structure no. 000000000005809

Built
1995
30 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
6,178
2020 count
Owner
County
County Highway Agency

About this bridge

Rushton Road over Walker Drain is a prestressed concrete box beam or girders - multiple carrying Rushton Road over Walker Drain in Livingston County, Michigan. It was built in 1995, so it is 30 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,178 vehicles a day, projected to reach 7,414 by 2040. The structure is 60 ft (18.2 m) long and 44 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesRushton Road
CrossesWalker Drain
LocationSec 26 Green Oak Twp
RouteCounty Highway 4793
Coordinates42.45294, -83.69602
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating95.3 US tons
Inventory rating57.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length60 ft (18.2 m)
Longest span56 ft (17 m)
Deck width44 ft (13.3 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,178 (2020)
Projected traffic7,414 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rushton Road over Walker Drain built?

It was built in 1995, making it 30 years old in 2025.

What condition is Rushton Road over Walker Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Rushton Road over Walker Drain carry?

About 6,178 vehicles per day (2020 count).

How long is Rushton Road over Walker Drain?

The structure is 60 ft (18.2 m) long with a longest span of 56 ft (17 m) and a deck 44 ft wide.

Who owns Rushton Road over Walker Drain?

It is owned by the County Highway Agency.