Second Street over Flint River
GoodLapeer County, Michigan · Village of Columbiaville · Structure no. 000000000005479
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 120 ft
- 2 main spans
- Daily traffic
- 3,486
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Second Street over Flint River is a prestressed concrete box beam or girders - single or spread carrying Second Street over Flint River in Lapeer County, Michigan. It was built in 2020, so it is 5 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,486 vehicles a day, roughly 5% of them trucks, projected to reach 4,254 by 2039. The structure is 120 ft (36.6 m) long and 42 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Second Street over Flint River built?
It was built in 2020, making it 5 years old in 2025.
What condition is Second Street over Flint River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Second Street over Flint River carry?
About 3,486 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is Second Street over Flint River?
The structure is 120 ft (36.6 m) long with a longest span of 58 ft (17.8 m) and a deck 42 ft wide.
Who owns Second Street over Flint River?
It is owned by the City or Municipal Highway Agency.