Peppermill Road over South Br. Flint River
FairPosted for loadLapeer County, Michigan · Sec. 10 Lapeer Twp. · Structure no. 000000000005435
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected July 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 616
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Peppermill Road over South Br. Flint River is a prestressed concrete tee beam carrying Peppermill Road over South Br. Flint River in Lapeer County, Michigan. It was built in 1991, so it is 34 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 616 vehicles a day, projected to reach 752 by 2040. The structure is 50 ft (15.2 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Peppermill Road over South Br. Flint River built?
It was built in 1991, making it 34 years old in 2025.
What condition is Peppermill Road over South Br. Flint River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Peppermill Road over South Br. Flint River carry?
About 616 vehicles per day (2020 count).
How long is Peppermill Road over South Br. Flint River?
The structure is 50 ft (15.2 m) long with a longest span of 47 ft (14.3 m) and a deck 33 ft wide.
Who owns Peppermill Road over South Br. Flint River?
It is owned by the County Highway Agency.