Summers Road over Weston Drain
FairPosted for loadLapeer County, Michigan · Sec. 31 Imlay Twp. · Structure no. 000000000005427
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected July 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 405
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Summers Road over Weston Drain is a prestressed concrete tee beam carrying Summers Road over Weston Drain in Lapeer County, Michigan. It was built in 1992, so it is 33 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 405 vehicles a day, projected to reach 494 by 2038. The structure is 40 ft (12.2 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Summers Road over Weston Drain built?
It was built in 1992, making it 33 years old in 2025.
What condition is Summers Road over Weston Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Summers Road over Weston Drain carry?
About 405 vehicles per day (2018 count).
How long is Summers Road over Weston Drain?
The structure is 40 ft (12.2 m) long with a longest span of 37 ft (11.2 m) and a deck 33 ft wide.
Who owns Summers Road over Weston Drain?
It is owned by the County Highway Agency.