US Bridges

US-131 SB over Cesar E Chavez Ave

Good

Kent County, Michigan · In Grand Rapids · Structure no. 000000000012869

Built
1999
26 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
1,359 ft
8 main spans
Daily traffic
49,600
2012 count
Owner
State
State Highway Agency

About this bridge

US-131 SB over Cesar E Chavez Ave is a steel stringer/multi-beam or girder carrying US-131 SB over Cesar E Chavez Ave in Kent County, Michigan. It was built in 1999, so it is 26 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49,600 vehicles a day, roughly 6% of them trucks, projected to reach 59,479 by 2018. The structure is 1,359 ft (414.1 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS-131 SB
CrossesCesar E Chavez Ave
LocationIn Grand Rapids
RouteU.S. Route 131
Coordinates42.95969, -85.67245
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating36.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans8
Design loadHS 25 or greater
Structure length1,359 ft (414.1 m)
Longest span186 ft (56.8 m)
Deck width60 ft (18.4 m)
Roadway width57 ft (17.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49,600 (2012)
Projected traffic59,479 by 2018
Trucks6%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US-131 SB over Cesar E Chavez Ave built?

It was built in 1999, making it 26 years old in 2025.

What condition is US-131 SB over Cesar E Chavez Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does US-131 SB over Cesar E Chavez Ave carry?

About 49,600 vehicles per day (2012 count), of which roughly 6% are trucks.

How long is US-131 SB over Cesar E Chavez Ave?

The structure is 1,359 ft (414.1 m) long with a longest span of 186 ft (56.8 m) and a deck 60 ft wide.

Who owns US-131 SB over Cesar E Chavez Ave?

It is owned by the State Highway Agency.