M-11 over Grand River
FairKent County, Michigan · In Grandville · Structure no. 000000000004862
- Built
- 1930
- 95 years old, rebuilt 1985
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 550 ft
- 8 main spans
- Daily traffic
- 21,410
- 2007 count
- Owner
- State
- State Highway Agency
About this bridge
M-11 over Grand River is a steel stringer/multi-beam or girder carrying M-11 over Grand River in Kent County, Michigan. It was built in 1930 and reconstructed in 1985, so it is 95 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,410 vehicles a day, roughly 8% of them trucks, projected to reach 30,419 by 2018. The structure is 550 ft (167.6 m) long and 68 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M-11 over Grand River built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1985.
What condition is M-11 over Grand River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does M-11 over Grand River carry?
About 21,410 vehicles per day (2007 count), of which roughly 8% are trucks.
How long is M-11 over Grand River?
The structure is 550 ft (167.6 m) long with a longest span of 75 ft (22.9 m) and a deck 68 ft wide.
Who owns M-11 over Grand River?
It is owned by the State Highway Agency.