M-21 over Grand Rapids Eastern RR

Good

Kent County, Michigan · 3.5 MI W of Ada · Structure no. 000000000004858

Built
1977
48 years old, rebuilt 2015
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
225 ft
3 main spans
Daily traffic
29,250
2015 count
Owner
State
State Highway Agency

About this bridge

M-21 over Grand Rapids Eastern RR is a prestressed concrete stringer/multi-beam or girder carrying M-21 over Grand Rapids Eastern RR in Kent County, Michigan. It was built in 1977 and reconstructed in 2015, so it is 48 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,250 vehicles a day, roughly 4% of them trucks, projected to reach 34,000 by 2035. The structure is 225 ft (68.5 m) long and 91 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesM-21
CrossesGrand Rapids Eastern RR
Location3.5 MI W of Ada
RouteState Highway 21
Coordinates42.96282, -85.55706
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.3 US tons
Inventory rating42.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadGreater than HL 93
Structure length225 ft (68.5 m)
Longest span75 ft (22.9 m)
Deck width91 ft (27.6 m)
Roadway width73 ft (22.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,250 (2015)
Projected traffic34,000 by 2035
Trucks4%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was M-21 over Grand Rapids Eastern RR built?

It was built in 1977, making it 48 years old in 2025. It was reconstructed in 2015.

What condition is M-21 over Grand Rapids Eastern RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does M-21 over Grand Rapids Eastern RR carry?

About 29,250 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is M-21 over Grand Rapids Eastern RR?

The structure is 225 ft (68.5 m) long with a longest span of 75 ft (22.9 m) and a deck 91 ft wide.

Who owns M-21 over Grand Rapids Eastern RR?

It is owned by the State Highway Agency.