US Bridges

Milham Ave over Portage Creek

GoodPosted for load

Kalamazoo County, Michigan · Sec 3-10 Portage Twp · Structure no. 000000000004689

Built
1990
35 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
22 ft
1 main span
Daily traffic
13,142
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Milham Ave over Portage Creek is a concrete culvert carrying Milham Ave over Portage Creek in Kalamazoo County, Michigan. It was built in 1990, so it is 35 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 13,142 vehicles a day, roughly 4% of them trucks, projected to reach 18,398 by 2042. The structure is 22 ft (6.6 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesMilham Ave
CrossesPortage Creek
LocationSec 3-10 Portage Twp
RouteCity Street 0
Coordinates42.23014, -85.57658
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length22 ft (6.6 m)
Longest span20 ft (6.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,142 (2022)
Projected traffic18,398 by 2042
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Milham Ave over Portage Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is Milham Ave over Portage Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Milham Ave over Portage Creek carry?

About 13,142 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Milham Ave over Portage Creek?

The structure is 22 ft (6.6 m) long with a longest span of 20 ft (6.1 m).

Who owns Milham Ave over Portage Creek?

It is owned by the City or Municipal Highway Agency.