US Bridges

W Avenue over Portage River

Good

Kalamazoo County, Michigan · 2 MI East of Vicksburg · Structure no. 000000000004624

Built
1993
32 years old
Condition
Good
inspected June 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
4,271
2015 count
Owner
County
County Highway Agency

About this bridge

W Avenue over Portage River is a prestressed concrete box beam or girders - multiple carrying W Avenue over Portage River in Kalamazoo County, Michigan. It was built in 1993, so it is 32 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,271 vehicles a day, roughly 3% of them trucks, projected to reach 6,923 by 2035. The structure is 60 ft (18.3 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesW Avenue
CrossesPortage River
Location2 MI East of Vicksburg
RouteCounty Highway 3912
Coordinates42.11462, -85.48549
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.3 US tons
Inventory rating60.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span56 ft (17 m)
Deck width44 ft (13.4 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,271 (2015)
Projected traffic6,923 by 2035
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was W Avenue over Portage River built?

It was built in 1993, making it 32 years old in 2025.

What condition is W Avenue over Portage River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does W Avenue over Portage River carry?

About 4,271 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is W Avenue over Portage River?

The structure is 60 ft (18.3 m) long with a longest span of 56 ft (17 m) and a deck 44 ft wide.

Who owns W Avenue over Portage River?

It is owned by the County Highway Agency.