Ellison Road over Holmes & Spears Drain
GoodIonia County, Michigan · 0.25 MI W of Johnson RD · Structure no. 000000000013829
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected October 2023
- Type
- Culvert
- Steel
- Length
- 21 ft
- 1 main span
- Daily traffic
- 250
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Ellison Road over Holmes & Spears Drain is a steel culvert carrying Ellison Road over Holmes & Spears Drain in Ionia County, Michigan. It was built in 2014, so it is 11 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 250 vehicles a day, projected to reach 280 by 2034. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ellison Road over Holmes & Spears Drain built?
It was built in 2014, making it 11 years old in 2025.
What condition is Ellison Road over Holmes & Spears Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Ellison Road over Holmes & Spears Drain carry?
About 250 vehicles per day (2014 count).
How long is Ellison Road over Holmes & Spears Drain?
The structure is 21 ft (6.4 m) long with a longest span of 21 ft (6.4 m).
Who owns Ellison Road over Holmes & Spears Drain?
It is owned by the County Highway Agency.