North Bridge ST over Grand River-Channel

FairPosted for load

Ionia County, Michigan · 0.32 M S M21 in Saranac · Structure no. 000000000004109

Built
1977
48 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
463 ft
6 main spans
Daily traffic
7,300
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

North Bridge ST over Grand River-Channel is a prestressed concrete box beam or girders - multiple carrying North Bridge ST over Grand River-Channel in Ionia County, Michigan. It was built in 1977, so it is 48 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 7,300 vehicles a day, roughly 5% of them trucks, projected to reach 8,300 by 2037. The structure is 463 ft (141.1 m) long and 40 ft wide. If it were closed, the detour would be 14.9 mi (24 km).

CarriesNorth Bridge ST
CrossesGrand River-Channel
Location0.32 M S M21 in Saranac
RouteCounty Highway 3415
Coordinates42.93268, -85.21333
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans6
Design loadHS 20 + Mod
Structure length463 ft (141.1 m)
Longest span76 ft (23.2 m)
Deck width40 ft (12.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,300 (2017)
Projected traffic8,300 by 2037
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed14.9 mi (24 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was North Bridge ST over Grand River-Channel built?

It was built in 1977, making it 48 years old in 2025.

What condition is North Bridge ST over Grand River-Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does North Bridge ST over Grand River-Channel carry?

About 7,300 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is North Bridge ST over Grand River-Channel?

The structure is 463 ft (141.1 m) long with a longest span of 76 ft (23.2 m) and a deck 40 ft wide.

Who owns North Bridge ST over Grand River-Channel?

It is owned by the City or Municipal Highway Agency.