M-43 WB (oakland) over Grand River

Fair

Ingham County, Michigan · In Lansing (oakland St) · Structure no. 000000000003790

Built
1966
59 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
279 ft
3 main spans
Daily traffic
10,885
2007 count
Owner
State
State Highway Agency

About this bridge

M-43 WB (oakland) over Grand River is a steel stringer/multi-beam or girder carrying M-43 WB (oakland) over Grand River in Ingham County, Michigan. It was built in 1966, so it is 59 years old, older than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,885 vehicles a day, roughly 2% of them trucks, projected to reach 22,071 by 2018. The structure is 279 ft (85 m) long and 64 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesM-43 WB (oakland)
CrossesGrand River
LocationIn Lansing (oakland St)
RouteState Highway 43
Coordinates42.74352, -84.54984
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.1 US tons
Inventory rating40 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length279 ft (85 m)
Longest span100 ft (30.5 m)
Deck width64 ft (19.6 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,885 (2007)
Projected traffic22,071 by 2018
Trucks2%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$365,000
NavigationNo navigation control on waterway

Frequently asked questions

When was M-43 WB (oakland) over Grand River built?

It was built in 1966, making it 59 years old in 2025.

What condition is M-43 WB (oakland) over Grand River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does M-43 WB (oakland) over Grand River carry?

About 10,885 vehicles per day (2007 count), of which roughly 2% are trucks.

How long is M-43 WB (oakland) over Grand River?

The structure is 279 ft (85 m) long with a longest span of 100 ft (30.5 m) and a deck 64 ft wide.

Who owns M-43 WB (oakland) over Grand River?

It is owned by the State Highway Agency.