US Bridges

Puwalowski Road over Allen Drain

Good

Huron County, Michigan · Sec 25-36 Sigel Twp · Structure no. 000000000003669

Built
1997
28 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
48 ft
1 main span
Daily traffic
20
2009 count
Owner
County
County Highway Agency

About this bridge

Puwalowski Road over Allen Drain is a prestressed concrete box beam or girders - multiple carrying Puwalowski Road over Allen Drain in Huron County, Michigan. It was built in 1997, so it is 28 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20 vehicles a day, projected to reach 36 by 2029. The structure is 48 ft (14.6 m) long and 34 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesPuwalowski Road
CrossesAllen Drain
LocationSec 25-36 Sigel Twp
RouteCounty Highway 0
Coordinates43.78703, -82.76858
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.3 US tons
Inventory rating45.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length48 ft (14.6 m)
Longest span46 ft (14 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2009)
Projected traffic36 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Puwalowski Road over Allen Drain built?

It was built in 1997, making it 28 years old in 2025.

What condition is Puwalowski Road over Allen Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Puwalowski Road over Allen Drain carry?

About 20 vehicles per day (2009 count).

How long is Puwalowski Road over Allen Drain?

The structure is 48 ft (14.6 m) long with a longest span of 46 ft (14 m) and a deck 34 ft wide.

Who owns Puwalowski Road over Allen Drain?

It is owned by the County Highway Agency.