S County Line Road over Ferdon Drain
GoodGratiot County, Michigan · Sec 33 Washington Twp · Structure no. 000000000003246
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 139
- 2005 count
- Owner
- County
- County Highway Agency
About this bridge
S County Line Road over Ferdon Drain is a prestressed concrete box beam or girders - multiple carrying S County Line Road over Ferdon Drain in Gratiot County, Michigan. It was built in 1988, so it is 37 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 139 vehicles a day, projected to reach 166 by 2025. The structure is 26 ft (7.9 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S County Line Road over Ferdon Drain built?
It was built in 1988, making it 37 years old in 2025.
What condition is S County Line Road over Ferdon Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does S County Line Road over Ferdon Drain carry?
About 139 vehicles per day (2005 count).
How long is S County Line Road over Ferdon Drain?
The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m) and a deck 31 ft wide.
Who owns S County Line Road over Ferdon Drain?
It is owned by the County Highway Agency.