US Bridges

Ketola Grade Road over Black River

Poor

Gogebic County, Michigan · Sec 33-34 Erwin Twp · Structure no. 000000000003007

Built
1994
31 years old
Condition
Poor
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
28 ft
1 main span
Daily traffic
3
1998 count
Owner
County
County Highway Agency

About this bridge

Ketola Grade Road over Black River is a steel stringer/multi-beam or girder carrying Ketola Grade Road over Black River in Gogebic County, Michigan. It was built in 1994, so it is 31 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 3 vehicles a day. The structure is 28 ft (8.5 m) long and 14 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesKetola Grade Road
CrossesBlack River
LocationSec 33-34 Erwin Twp
RouteCounty Highway 0
Coordinates46.3441, -90.05274
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating107.1 US tons
Inventory rating73.5 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span24 ft (7.3 m)
Deck width14 ft (4.3 m)
Roadway width12 ft (3.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3 (1998)
Projected traffic—
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$183,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Ketola Grade Road over Black River built?

It was built in 1994, making it 31 years old in 2025.

What condition is Ketola Grade Road over Black River in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.

How much traffic does Ketola Grade Road over Black River carry?

About 3 vehicles per day (1998 count).

How long is Ketola Grade Road over Black River?

The structure is 28 ft (8.5 m) long with a longest span of 24 ft (7.3 m) and a deck 14 ft wide.

Who owns Ketola Grade Road over Black River?

It is owned by the County Highway Agency.