US Bridges

Lake Gogebic Road over Slate River

Poor

Gogebic County, Michigan · Sec 3 Marenisco Twp · Structure no. 000000000002999

Built
1978
47 years old
Condition
Poor
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
95 ft
3 main spans
Daily traffic
400
2017 count
Owner
County
County Highway Agency

About this bridge

Lake Gogebic Road over Slate River is a prestressed concrete box beam or girders - multiple carrying Lake Gogebic Road over Slate River in Gogebic County, Michigan. It was built in 1978, so it is 47 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 400 vehicles a day, roughly 3% of them trucks, projected to reach 400 by 2037. The structure is 95 ft (28.9 m) long and 31 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesLake Gogebic Road
CrossesSlate River
LocationSec 3 Marenisco Twp
RouteCounty Highway 2778
Coordinates46.40639, -89.55223
Functional classRural Major Collector

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating44.6 US tons
Inventory rating34.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length95 ft (28.9 m)
Longest span32 ft (9.7 m)
Deck width31 ft (9.3 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2017)
Projected traffic400 by 2037
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$669,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Lake Gogebic Road over Slate River built?

It was built in 1978, making it 47 years old in 2025.

What condition is Lake Gogebic Road over Slate River in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.

How much traffic does Lake Gogebic Road over Slate River carry?

About 400 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is Lake Gogebic Road over Slate River?

The structure is 95 ft (28.9 m) long with a longest span of 32 ft (9.7 m) and a deck 31 ft wide.

Who owns Lake Gogebic Road over Slate River?

It is owned by the County Highway Agency.