S SAGINAW(OLDM-54) over I-75
FairGenesee County, Michigan · @ Oakland County Line · Structure no. 000000000002625
- Built
- 1962
- 63 years old, rebuilt 1980
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 309 ft
- 4 main spans
- Daily traffic
- 8,800
- 1995 count
- Owner
- State
- State Highway Agency
About this bridge
S SAGINAW(OLDM-54) over I-75 is a steel stringer/multi-beam or girder carrying S SAGINAW(OLDM-54) over I-75 in Genesee County, Michigan. It was built in 1962 and reconstructed in 1980, so it is 63 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,800 vehicles a day, roughly 5% of them trucks, projected to reach 999,999 by 2015. The structure is 309 ft (94.2 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S SAGINAW(OLDM-54) over I-75 built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1980.
What condition is S SAGINAW(OLDM-54) over I-75 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does S SAGINAW(OLDM-54) over I-75 carry?
About 8,800 vehicles per day (1995 count), of which roughly 5% are trucks.
How long is S SAGINAW(OLDM-54) over I-75?
The structure is 309 ft (94.2 m) long with a longest span of 100 ft (30.4 m) and a deck 37 ft wide.
Who owns S SAGINAW(OLDM-54) over I-75?
It is owned by the State Highway Agency.