M-43 over Sebewa Drain
FairEaton County, Michigan · 2.0 MI E of Sunfield · Structure no. 000000000002226
- Built
- 1949
- 76 years old, rebuilt 2004
- Condition
- Fair
- inspected April 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 37 ft
- 1 main span
- Daily traffic
- 4,192
- 2007 count
- Owner
- State
- State Highway Agency
About this bridge
M-43 over Sebewa Drain is a prestressed concrete box beam or girders - single or spread carrying M-43 over Sebewa Drain in Eaton County, Michigan. It was built in 1949 and reconstructed in 2004, so it is 76 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,192 vehicles a day, roughly 8% of them trucks, projected to reach 4,592 by 2018. The structure is 37 ft (11.2 m) long and 46 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M-43 over Sebewa Drain built?
It was built in 1949, making it 76 years old in 2025. It was reconstructed in 2004.
What condition is M-43 over Sebewa Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does M-43 over Sebewa Drain carry?
About 4,192 vehicles per day (2007 count), of which roughly 8% are trucks.
How long is M-43 over Sebewa Drain?
The structure is 37 ft (11.2 m) long with a longest span of 32 ft (9.8 m) and a deck 46 ft wide.
Who owns M-43 over Sebewa Drain?
It is owned by the State Highway Agency.