RD N3015 over Sturgeon River
FairClosed to trafficDickinson County, Michigan · 200 Ft W of Foster Cty RD · Structure no. 000000000014727
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected April 2025
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 63 ft
- 2 main spans
- Daily traffic
- 99
- Owner
- State
- Other State Agency
About this bridge
RD N3015 over Sturgeon River is a wood or timber stringer/multi-beam or girder carrying RD N3015 over Sturgeon River in Dickinson County, Michigan. It was built in 1997, so it is 28 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.
It carries about 99 vehicles a day. The structure is 63 ft (19.2 m) long and 14 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RD N3015 over Sturgeon River built?
It was built in 1997, making it 28 years old in 2025.
What condition is RD N3015 over Sturgeon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2025.
How much traffic does RD N3015 over Sturgeon River carry?
About 99 vehicles per day (latest count).
How long is RD N3015 over Sturgeon River?
The structure is 63 ft (19.2 m) long with a longest span of 29 ft (8.9 m) and a deck 14 ft wide.
Who owns RD N3015 over Sturgeon River?
It is owned by the Other State Agency.